Aman'Thul's Titan Archive · Quest record 37183

The Critical Path

A verified Blizzard quest record from Talador. Use the archive brief, rewards, and linked research to finish it without losing your place.

TaladorAllianceLevel 20 - 40

Where to go

We have no location for this quest.

The game client's quest table carries no marker for this one. 21,736 of the 31,273 quests in this database have one. We would rather say that than draw a pin we invented.

unconfirmed. We could not confirm this. It is shown so you know the gap exists, not as a recommendation.client build 12.1.0.69587

Quest start

Who gives The Critical Path

0 records

The NPC, object, or item that starts this quest, with the first known coordinate when available.

The relationship source is temporarily unavailable. In-game observations will appear here as players sync them.

Quest completion

Where to turn it in

0 records

The NPC or object that accepts the completed quest. Phasing and alternate-faction versions can produce more than one endpoint.

The relationship source is temporarily unavailable. In-game observations will appear here as players sync them.

Identity and tooltip facts come from Blizzard. Relationship rows are refreshed from Wowhead's structured source tables and merged with anonymous in-game observations from WoW-God Sync. Inspect source

What To Do

Complete the quest objective shown in your tracker in Talador, then return to the turn-in NPC.

Quest Text

The auburn forests of Talador sit at a critical crossroads of this continent, commander. The Iron Horde's fleet is already en route from Gorgrond to Shattrath on the west coast. Talador will fall if we don't reinforce them. I took the liberty of dispatching Foreman Eksos, who has already begun construction on an outpost for your forces not far from the Iron Horde landing point. He awaits your orders sir.

Aman'Thul's field brief

Plan the run before you travel

Archive context

Talador belongs to the Warlords of Draenor archive. Start with its campaign track if this record is unavailable or the next step is missing.

Stuck?

Check the exact quest giver and turn-in records above first. Use this page's community comments for phase changes, cave entrances, spawn timing, and corrections from the live game.

Group size

No group size is listed by Blizzard, so this is usually soloable unless the objective text says otherwise.

Use the evidence

Pin the quest in-game, enable objective outlines, then use the exact-title references in the archive for NPC or object coordinates. Add a correction below if the live game differs from this record.

Field notes

Objectives and map pin

Blizzard's public API publishes a quest's text and rewards but not its objectives, its own level, whether it can be shared, or any map coordinate. Nobody has synced quest 37183 yet, so there is nothing to show here rather than a guess. Running the WowGodSync addon while you play contributes those fields for everyone.

Have I done this?

Check it in game

Quest completion is stored per character on Blizzard's side and is not in the public API, so paste this in your chat box and it prints true or false for “The Critical Path” on the character you are logged into.

Completion check
/run print(C_QuestLog.IsQuestFlaggedCompleted(37183))
Warband-wide check (11.0+)
/run print(C_QuestLog.IsQuestFlaggedCompletedOnAccount(37183))

A false also comes back for a quest id the client does not know, so it means “not recorded as complete” rather than proof the quest exists on your account.

Community quest record

What people know about The Critical Path

Nobody has written this up yet

Checking the community archive...

WoW-God links to external research; it does not copy Wowhead guides, player comments, or video transcripts.

Rewards

Experience
675
Money
1g 69s 80c

More notable quests

Comments

Comments load when you reach this section.

Loading comments...